Cobb County |
Code of Ordinances |
Part I. OFFICIAL CODE OF COBB COUNTY, GEORGIA |
Chapter 122. UTILITIES |
Article II. WATER AND WASTEWATER SYSTEMS |
Division 6. NONDOMESTIC USE OF PUBLIC WASTEWATER FACILITIES |
§ 122-190. Procedure for uses to establish retainage for credit against wastewater service charges.
Any industrial, commercial or institutional user of the county wastewater system will not be required to pay wastewater service charges for metered water which the customer does not return to the sewer, provided the following conditions are met:
(1)
The user must have a retainage analysis conducted twice per year by an independent engineering firm, which shall be approved by the water system. The retainage analysis shall provide a value of retainage which will be a longterm average of the percentage of water used which is not returned to the sewer.
(2)
The user shall pay the engineer's fees for the retainage analysis.
(3)
The retainage analysis must bear the seal of the engineer who performed the analysis.
(4)
The water system may elect, at its sole discretion, to waive one of the two annual retainage analyses.
(5)
The county reserves the right to dictate which months of the year the retainage analyses will be performed.
(Ord. of 6-28-88, § 3-26-101; Amd. of 2-24-09)