Cobb County |
Code of Ordinances |
Part I. OFFICIAL CODE OF COBB COUNTY, GEORGIA |
Chapter 122. UTILITIES |
Article II. WATER AND WASTEWATER SYSTEMS |
Division 4. CONSTRUCTION STANDARDS |
§ 122-119. Water and wastewater connections.
(a)
Construction procedures.
(1)
All water and wastewater connections that might impact public roadways shall be carefully evaluated to identify means available to minimize impacts to existing pavement;
(2)
No pavement cut of a Cobb County road shall occur without permit from the Cobb County Department of Transportation.
(3)
All road cuts and restorations shall be performed in compliance with applicable provisions of the Development Standards of Cobb County.
(b)
Inspection of connections by county. The applicant for a building sewer connection permit shall notify the department director when the building sewer is ready for inspection and connection to the county wastewater system. The connection and testing shall be made in the presence of the department director or his representative.
(c)
Guarding excavations. All excavations for building sewer installation shall be adequately guarded with barricades and lights in compliance with all OSHA and state department of transportation requirements so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored to substantially the same condition as prior to the disturbance in a manner satisfactory to the county.
(Ord. of 6-28-88, § 3-26-49; Ord. of 2-27-07)